News

  • Photo: NCRR

06.11.2019

Artikel Nummer: 29574

US short line can handle heavier freight cars


North Carolina & Virginia Railroad (NCVA) has upgraded its entire line to handle 143 t railcar loadings. Until now, the railroad’s infrastructure was limited to 135.6 t railcar loadings.

 

In an USD 11.6-million project to achieve the capacity improvement, NCVA installed 34 km of continuous-welded rail; replaced 25,700 crossties, 12 turnouts and eight grade crossings; resurfaced 82 track km, including the addition of 22,500 t of stone ballast; and performed extensive upgrades to its Meherrin river bridge.

 

NCVA is a 90-km short line freight railroad operating between Boykins (VA) and Tunis (NC). The railways are a subsidiary of G&W, which owns or leases 119 freight railroads. (ben)

www.gwrr.com

 

 

 

Related news